Reserve from the case
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 31 - Sep 5
Reserve from the case
Ships within 48 hours · Estimated delivery Aug 31 - Sep 5
Ties between 155 – 260 ties per coil
Weight: 80kg
Bitumen-based
Replacement rubber sealing belt for the DRU160 core drill stand
MAP Planiprep SC 4.5kg ww-sh-primerslevelling Ties between 155 – 260Mapei Planiprep SC skimcoating compound. Fast drying, polymer modified, fibre reinforced skimcoating and patching compound for interior floor surfaces. Formulated to produce a creamy texture for easy application with a trowel to create a defect free surface. Pot life: 16 22 minutes Initial setting time at 20 C: 20 30 minutes Final setting time at 20 C: 60 minutes Application depth: 0. 1 25 mm Approximate consumption: 0. 23 kg m2 per mm of thickness
Pay in 4 interest-free payments of $10.66 Learn more